1. Official Project Gold Filings
| Document Item | Details | Filing Date |
|---|---|---|
| Conditional Use Narrative (Project Gold) | Comprehensive narrative by Goldsboro Land, LLC detailing reengineered 6-building layout, closed-loop cooling, and 2.2 GW grid power. | August 18, 2026 |
| Conditional Use Site Plans (Langan CS100–106) | Engineered site drawings prepared by Langan Engineering showing building FFEs, Dorantown Substation, and wetland fill boundaries. | August 18, 2026 |
| Covington Public Hearing Application | Signed application by Anthony Maras, Esq. (Quantm Group) seeking Conditional Use under Ordinance No. 2025-03. | August 17, 2026 |
| Clifton Township Code Library | Codified township zoning and land use regulations. | Active Code |